Run in production
Once JaaS is installed, these pages cover keeping it healthy in production: the posture to set before going live, what to watch day to day, how to size it, and how to recover its state.
- Production — the security and availability posture to set before going live.
- Operations — day-two running: what to watch and routine tasks.
- Scale and capacity — sizing, throughput, and resource tuning.
- Backup and disaster recovery — what to back up and how to recover.